Case Studies
Case Studies
- • Buncefield Terminal Redevelopment
- • Thames Pumpstation Rebuild
- • Booster Station Refurbishment
- • Kuwait Pipeline Design
- • Operation, Maintenance and Management Services for the Colnbrook Rail Terminal and Colnbrook Pipeline
- • SCADA System Replacement Project
- • Pumpstation Rebuild and Pipeline Recommissioning
- • Secondary and Tertiary Containment Enhancements
- • Aviation Fuel Tank Construction and Commissioning
- • Petroleum Supply Depot Technical Consulting
- • Design and Build of a 24″ Gas Pipeline
- • Design and Construction of a Multi-product Pipeline in Malaysia
- • Military Fuel Infrastructure Inspections
- • New Aviation Fuel Bulk Storage Tank Construction
- • Bowling Spur Pipeline Technical Consulting
- • Bacton – North Walsham Gas Condensate System Operation and Maintenance
- • North Walsham Gas Condensate Rail Loading Conversion to Bottom Loading and Vapour Recovery Design and Project Management
- • Cathodic Protection Consultancy for Crude Oil and Natural Gas Pipeline System in the Caspian Region
- • Fuel Storage COMAH Works
-
Buncefield Terminal Redevelopment
The objective of the project is to rebuild the bulk oil terminal which was destroyed in ...
Read More... -
Thames Pumpstation Rebuild
The UKOP system is an oil products pipeline system owned by a consortium of UK oil ...
Read More... -
Booster Station Refurbishment
The Booster Station at Royal Portbury Dock facility in Bristol supplies product into the 2000km GPSS ...
Read More... -
Kuwait Pipeline Design
The Kuwait National Petroleum Company (KNPC) intends to construct a new local marketing depot at Al ...
Read More... -
Operation, Maintenance and Management Services for the Colnbrook Rail Terminal and Colnbrook Pipeli
The Colnbrook Rail Terminal incorporates a rail offloading facility and a 1.9km 12” pipeline feeding the ...
Read More... -
SCADA System Replacement Project
The UKOP system is an oil products pipeline system owned by a consortium of UK oil ...
Read More... -
Pumpstation Rebuild and Pipeline Recommissioning
Following the refurbishment of their tank farm, OIKOS identified the need to recommission their 12″ pipeline ...
Read More... -
Pipeline Operations Performance Benchmarking – Petroleum Products Pipeline in South America
BPA developed an operational improvement plan for the largest pipeline system in South America. A high ...
Read More...